What are Rising Mains, Dry Riser and Wet Riser?

What are Rising Mains, Dry Riser and Wet Riser?

Placeholder
    • Related Articles

    • Dry Riser Marking

      Singapore Standards 575 : 2012 - 2.3.2.4 The position of inlets shall be indicated on the box using the appropriate sign and using a letter height of at least 50mm.
    • Wet Chemical System Servicing

      Servicing of Wet Chemical Will be at $XXX per system The price includes a service report , the replacement of fusible links and cartridges (where required) but does not include hydrostatic testing and refilling.
    • Wet Chemical/Kitchen Hood servicing checklist

      Please find our servicing checklist attached.
    • What is a Standby fire hose? What is a Fire man hose?

      A standby hose is a fire fighting hose that is located near the rising mains. During fire fighting, the standby hose will be connected to the rising mains so that there is a ready supply of water for the firemen to use.  Image: Standby Fire hose from ...
    • Capacity to use - Class A

      According to Singapore Standards 578, the minimum requirement for class A hazards will be 13A fire extinguishers. Hercules 2KG Dry powder Fire Extinguishers will comply to this requirement. According to the classification of hazards according to ...